- The sheet rock has been hung now in the family room and office.
One minor mistake -- one set of speaker wires was hidden. That
should be corrected today.
- Over the weekend we decided on colors for all of the rooms.
We are the kind of people who only use two colors: flat white
and semi-gloss white. That's all we've ever used. In this
house we're using something like 10 different colors. It'll
be interesting to see what works or if we end up back at
white.
- Talked to
Mike about the fireplace today.
He said the new one should be here at the end of the month.
- Talked to
Dave about the covered wire,
fireplace, and door buzzer. We want to be able to unlock the
front door from upstairs & I noticed over the weekend
that no wires had been run to the door catch. Apparently
he though the
alarm guys were going to
do it & they thought the
electrician
was going to do it & he thought the door installers
were going to do it. That should be taken care of soon.
- Today we welcome back
CW Excavation. Looks
like they're going to backfill the front, side & back
yards.
Looks like now that things are coming together, we're going
to need to be even more diligent about looking for mistakes,
ours & theirs. It will still be cheaper to pay for these
now that wait, but with the sheetrock going up, the cost for
and modifications also goes up.